We have stranded bamboo flooring from TeraGren. It's even stronger than the bamboo we have in the office.
Wednesday, June 2, 2010
Wednesday, May 26, 2010
Drywall up
Framing is done
The framing is done. Not a lot this time. Just taking down some small walls under the steel beam, moving the basement door and reframing that, closing the old door into the kitchen, making a new opening, and the closets.
They also put blocking up in the kitchen. That way, when it's time to mount the cabinets, there is always solid wood behind it. No need to try and find a stud. Makes installation easier, and narrow cabinets will always have two sets of screws, even if there is only one stud behind the cabinet.
They also put blocking up in the kitchen. That way, when it's time to mount the cabinets, there is always solid wood behind it. No need to try and find a stud. Makes installation easier, and narrow cabinets will always have two sets of screws, even if there is only one stud behind the cabinet.
Friday, May 21, 2010
Steel beam in
2nd Phase begins
Now we're starting on the kitchen project. Converting the downstairs bedroom to a kitchen, and opening up the area that will be the dining room. Dennis Buckshaw and his crew are back again.
Before:
We had a birthday party at the house just before demolition, so I told half a dozen boys to do whatever they wanted to the walls... :)
Before:
We had a birthday party at the house just before demolition, so I told half a dozen boys to do whatever they wanted to the walls... :)
Tuesday, February 10, 2009
Solar panels are installed!
Monday, December 22, 2008
Kids are in their new bedrooms
We started moving stuff into the new rooms now. The kids are in their new bedrooms. The new bathroom is being used, and the bulk of the living room furniture is in the new livingroom. Still have plenty more to rearrange, but at least we can finally start using the new space in the house.
Carpeting is done
Carpets are done in the house. We went with Mohawk brand, SmartStrand. They are corn-based threads, which are better for the environment, naturally stain-resistant, and naturally very soft. All the floors upstairs are the same grey color. That way, it won't clash with any paint we use in the future. Downstairs is a pale tan color.
Septic system is in
Thursday, December 4, 2008
More inspector delays....
We need inspections for the septic system, so the excavator doesn't want to start digging the hole until Monday....
Most of the inside plumbing is done, at least. Just the final connection to the new waste pipe (can't do it yet, since the new pipe doesn't go anywhere.... :) )
Most of the inside plumbing is done, at least. Just the final connection to the new waste pipe (can't do it yet, since the new pipe doesn't go anywhere.... :) )