We have stranded bamboo flooring from TeraGren. It's even stronger than the bamboo we have in the office.
Wednesday, June 2, 2010
Wednesday, May 26, 2010
Drywall up
Framing is done
The framing is done. Not a lot this time. Just taking down some small walls under the steel beam, moving the basement door and reframing that, closing the old door into the kitchen, making a new opening, and the closets.
They also put blocking up in the kitchen. That way, when it's time to mount the cabinets, there is always solid wood behind it. No need to try and find a stud. Makes installation easier, and narrow cabinets will always have two sets of screws, even if there is only one stud behind the cabinet.
They also put blocking up in the kitchen. That way, when it's time to mount the cabinets, there is always solid wood behind it. No need to try and find a stud. Makes installation easier, and narrow cabinets will always have two sets of screws, even if there is only one stud behind the cabinet.
Friday, May 21, 2010
Steel beam in
2nd Phase begins
Now we're starting on the kitchen project. Converting the downstairs bedroom to a kitchen, and opening up the area that will be the dining room. Dennis Buckshaw and his crew are back again.
Before:
We had a birthday party at the house just before demolition, so I told half a dozen boys to do whatever they wanted to the walls... :)
Before:
We had a birthday party at the house just before demolition, so I told half a dozen boys to do whatever they wanted to the walls... :)
Subscribe to:
Posts (Atom)