House Addition
Blog Archive
►
2010
(5)
►
June
(1)
►
May
(4)
►
2009
(1)
►
February
(1)
▼
2008
(41)
►
December
(4)
►
November
(9)
►
October
(8)
▼
September
(11)
Passed framing and strapping inspection
Most of downstairs windows are in
Windows are going in
Roof shingles are on
Front door is in
No front door!
Roof is framed
2nd floor framed
1st floor framed
1st floor laid
Framing started
►
August
(7)
►
July
(2)
Friday, September 26, 2008
Passed framing and strapping inspection
No pictures for this post, but we passed the building inspection for the framing and strapping. That means we can start covering the walls up with siding and insulation.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment